Movers › Building & House Moving & Raising
What Good Building and House Moving and Raising Looks Like: The Standards Professionals Judge Each Other By
Structural movers — the specialists who lift buildings off their foundations and carry them down roads — work in one of the smallest trades in construction. This site lists 657 building and house moving and raising providers, and the good ones know each other, bid against each other, and judge each other by standards that are almost never written on a quote. Those standards exist because the work is unforgiving: a house is a rigid box designed to sit still, and everything about lifting it — the steel, the jacks, the cribbing, the dollies — is an argument that the box can be picked up without being twisted.
You do not need to become an engineer to use those standards. You need to know what the professionals look at when they walk a job site, because nearly all of it is observable from the driveway: the paperwork before the lift, the equipment under the house, the pace of the work, and the condition of the building when it comes back down. This guide translates the insiders’ checklist into plain sight.

Before anything moves: the paperwork professionals respect
A computed weight and a load path. The first thing a competent mover does is arithmetic. Washington State’s safety rules for moving structures — among the most explicit in the country — state the principle plainly: weights to be moved must be carefully computed, and the equipment furnished must provide a safety factor of five. Under the house, that computation becomes a plan: which walls are load-bearing, where the beams go, where the jacks sit, how the load travels from the structure into the steel and down into the ground. A mover who talks about your house’s weight, its load-bearing walls, and its chimney as a concentrated load is speaking the trade’s language. A mover who glances at the house and names a price is not.
An engineer in the loop. For raises — where a new foundation must receive the building — professionals expect a licensed structural engineer’s assessment and stamped plans: the load path, the new foundation design, the target elevation. The building permit rests on those plans. Corner-cutting announces itself early here: a bid with no engineering line, offered for a lift that changes the foundation, is a bid that plans to improvise the most consequential part of the job.
Permits and route work, handled as a discipline. A relocation needs building permits at both ends and oversize-load road permits along the route; utilities must be coordinated — overhead lines raised or dropped, with legal clearance requirements over the road — and traffic control or police escort arranged where the permit demands it. The pros treat this as a schedule they manage, with names and dates. The amateurs treat it as your problem, discovered on moving day. Ask who is obtaining each permit and watch whether the answer is a list or a shrug.
Under the house: the equipment standards you can see
A unified jacking system — the trade’s defining standard. Modern structural moving is built on one machine: a unified hydraulic jacking system, in which every jack under the building is controlled from a single source so the entire structure rises together, in small, even increments — practitioners describe lifts proceeding about six inches at a time, with cribbing built up beneath between strokes. This is the standard because the enemy is differential movement: one corner rising faster than another twists the frame, and twisting is what cracks masonry, racks door frames, and breaks plaster. When you evaluate a mover, this is the question that separates the trade from the improvisers: Is your jacking system unified? A crew raising a house on independent bottle jacks, corner by corner, is not doing a cheaper version of the same job. They are doing a different and worse job, whatever the quote says.
Cribbing that never leaves the building resting on a jack. Cribbing — the interlocked stacks of hardwood or steel timbers built up under the beams — is the structure’s real support during a lift. The equipment makers state the principle as the industry states it: the structure never rests on the jack alone; the jack provides the force, and the crib tower provides the secure load path between cycles. Safety regulation backs the practice: when a structure is being lifted, shoring must be provided at all times and kept up to the object until the desired height is reached, then blocked or cribbed immediately; cribbing and blocking must sit on a level, firm foundation; and the timbers themselves must be sound, sized so deflection stays within tight limits — Washington’s rule allows no more than one inch of deflection per 200 inches of unsupported span. You can see all of this from outside the caution tape: neat, level, interlocked crib stacks on firm ground, built up in step with the lift — or scattered, leaning piles of whatever timber was on the truck.
Steel that becomes the house’s chassis. The beams are the surrogate foundation: main beams run the length of the house, cross beams — “crossers” — are placed across them at close intervals, roughly every four feet in typical practice, with needle beams supporting end walls, and every load-bearing point and floor-framing point supported. On the road, the building rides on a dolly system — the better firms run air-ride dollies specifically because they reduce the shocks transmitted into the structure — with safety chains between the running members and the towing vehicle as a secondary binding, as the regulations require. None of this requires expertise to assess at the level that matters: steel sized and spaced like it was planned, or steel that looks borrowed.

During and after: pace, monitoring, and the honest definition of “no damage”
Professionals judge each other on pace. A good lift is slow, synchronized, and boring: increments small, the crew watching the structure as it rises, the building’s level checked as it goes. Preparation takes the bulk of the calendar — planning and permits run to months on a relocation, while the physical move itself may take days to a couple of weeks — and a mover whose schedule is mostly moving day has inverted the trade’s real proportions.
And they judge each other on honesty about damage. The candid standard, stated by established movers in their own customer guidance, is this: minor sheetrock cracking and shifting is to be expected in a lift or move; hairline cracks can appear over doors and windows, sometimes after the house is set back down; and a well-executed job on a sound frame house ends virtually crack-free — but not guaranteed crack-free. Hold both halves of that. A mover who promises zero cracks, ever, is selling. A mover whose finished jobs show racked frames, doors that no longer close, and cracked masonry is not unlucky — twisted structures are the fingerprint of non-unified lifting and inadequate beam support, the two failures the standards above exist to prevent. The pre-move protection matters too: temporary interior bracing to protect finishes, utilities disconnected by the book — gas, water, electric, sewer — before any lift, because a ruptured line under a rising house converts a controlled job into an emergency.
The set-down: where good work is confirmed, not assumed
The last standard is the one owners most often skip, because by then everyone is tired and the house is visibly home. Professionals do not skip it. A good set-down reverses the lift with the same discipline: the building lowered in unison onto the new foundation, seated and leveled, the beams withdrawn without dragging the structure sideways, and the reconnections — plumbing, electrical, HVAC, sewer — made by the licensed trades who disconnected them, not by the moving crew as a favor. Then comes the verification layer: doors and windows checked for swing and latch, the structure checked for level, and, on a flood raise, a new elevation certificate surveyed to prove the finished floor sits at the required height — the document your insurer and your community will both ask for. The mover’s job is not finished when the house touches the foundation. It is finished when the house demonstrably works as a house again, and when the small, expected cosmetic damage — the hairline crack over the door — has been walked through with you and noted, rather than discovered by you a month later. Companies that schedule that walkthrough unprompted are telling you how they expect to be judged. They are usually right to be confident.
The checklist: judging a mover the way movers do
| Stage | What good looks like | Corner-cutting |
|---|---|---|
| Planning | Computed structure weight; equipment with a real safety factor; engineer’s plans for foundation work | A price from a glance; no engineering on a raise |
| Permits & route | Named permits at both ends and along the route; utility coordination scheduled | “We’ll sort the paperwork out” — on moving day |
| Jacking | Unified hydraulic system; small, even increments; cribbing built up with every stroke | Independent jacks, corner by corner; building left resting on jacks |
| Support | Level, interlocked cribbing on firm ground; sound timbers; beams at close, planned intervals | Leaning crib piles, mixed scrap timber, sparse steel |
| Transport | Air-ride dollies; safety chains as secondary binding; escorts where the permit requires | Bare dollies, single-point towing, improvised route |
| The promise | “Minor sheetrock cracking is normal; we aim for virtually crack-free” | “Zero damage, guaranteed” — or a trail of racked, cracked past jobs |
One credential check belongs on the list: the International Association of Structural Movers, the trade’s not-for-profit association since 1983, with more than 300 member companies, maintains a member directory. Membership is not a guarantee — but in a trade this small, a company’s peers are its reference check, and the association is where the peers are listed. Ask a mover who else bids work in your area, and then ask those companies about each other. Structural movers talk. Their judgments of one another — who runs unified systems, whose cribbing is clean, whose houses come down level — are the most reliable consumer information in this entire industry, and they are available to anyone willing to make two phone calls.
That is, in the end, what good looks like here: a building treated as a load to be computed rather than a box to be hauled, lifted in unison on steel and timber that were planned, at a pace that bores the neighbors, and set back down with nothing worse to show for it than a hairline crack over a door. When you see that standard on a job site, you are watching the professionals’ standard. Now you know how to see it.
Sources
- Washington Administrative Code 296-155-770, Moving of structures — that weights must be carefully computed with equipment providing a safety factor of five; that shoring must be provided at all times during a lift and the structure blocked or cribbed immediately at height; that cribbing must be set on a level, firm foundation; that timbers must be sound with deflection no more than one inch per 200 inches of unsupported span; and that safety chains are required between running members and the towing vehicle.
- Buckingham Equipment, House Cribbing FAQ — that cribbing carries the structure between jack strokes and the structure never rests on the jack alone; that crib jacks are rated and worked well below capacity for a safety factor; and that jack placement follows the structure’s load-bearing walls and concentrated loads.
- Rural Builder Magazine, “Buildings on the Move” — that a unified hydraulic jacking system raises a building about six inches at a time while crib piles are built up; that main and cross beams are placed at roughly four-foot intervals with needle beams at end walls; and that permits, utility line clearance, and escorts are arranged in advance.
- Payne Building Movers, FAQ — that the firm uses a unified hydraulic jacking system and air-ride dollies to reduce damage to structures, and that minor sheetrock cracking is to be expected while well-executed moves end virtually crack-free, with occasional hairline cracks over doors and windows.
- This Old House, A Comprehensive Guide to Moving a Whole House — that planning and permits take months while steel I-beams inserted under the sills act as a surrogate foundation, and that all utilities must be disconnected before the move.
- EngineerFix, How to Safely Jack Up a House — that a licensed engineer’s structural assessment identifies the load-bearing path and required lifting capacity before work begins, and that temporary interior bracing protects finishes during elevation.
- MoversLineup, House Movers cost guide — that the International Association of Structural Movers, founded in 1983, has over 300 members and keeps a directory of building movers.
- Photo by Alexander Isreb — https://www.pexels.com/photo/1797428/
- Photo by Tiger Lily — https://www.pexels.com/photo/4483610/
More guides
- How to Hire a Moving Company That Won't Hold Your Furniture HostageMovers › Moving & Storage
- How Much Do Movers Cost? Local vs. Long-Distance Pricing ExplainedMovers › Moving & Storage
- Binding vs. Non-Binding Estimates: The Difference That Decides Your Final BillMovers › Moving & Storage
- Moving Insurance and Valuation: What 'Full Value Protection' Really CoversMovers › Moving & Storage
- Long-Distance Moving: A Start-to-Finish Guide for Household GoodsMovers › Household Goods Moving & Storage
- All Guides & ArticlesBrowse the full guides library